Mining area reported in the project overview.
INDONESIA / CENTRAL SULAWESI
CENTRAL
SULAWESI
NICKEL.
A 993-hectare nickel project for acquisition and development discussions. Review the historical exploration, project footprint and potential logistics through local project relationships.
01 / PROJECT SNAPSHOT
993 HECTARES.
A closer look at the opportunity.
Assess the opportunity through four fundamentals: project area, historical geology, development requirements and access to market. The figures below are drawn from the supplied project overview and provide a starting point for independent review.
Common historical results; not a verified average resource grade.
Nickel-bearing material. Not a certified resource or reserve.
Reported distance to a third-party jetty. Access and capacity require confirmation.
Source: supplied Mining Opportunities in Indonesia overview. Project figures require independent verification. No asset valuation is implied.
02 / PROJECT LOCATION
Highlight traced from the supplied geological map. The source labels the project area as 993 ha. Indicative only; boundary, title and current status require verification.
A DEFINED AREA TO EVALUATE
SEE THE FOOTPRINT.
Understand the setting.
The supplied mapping places the project in Petasia, North Morowali, Central Sulawesi. Its outlined footprint provides a starting point for geological, land and access review.
- Reported area
- 993 hectares
- Supporting mapping
- Geology and forest classification
- Logistics opportunity
- Third-party jetty reported ~10 km away
The jetty is not plotted: its coordinates and a verified haul route are not included in the supplied material.
Discuss the project footprint
THE COMMERCIAL CONNECTION
A ROUTE
to market.
A prospective mine-to-jetty route is part of the opportunity. Confirming access, capacity and commercial terms is a critical next step.
03 / PROJECT DOSSIER
GEOLOGY. DEVELOPMENT. ACCESS.
Review the geological background, proposed operating scenarios and logistics assumptions. Each is a separate part of the acquisition assessment.
THE GEOLOGICAL RECORD
Work completed.
Further definition ahead.
The supplied overview records mapping, test pits, hand-auger and core drilling, sampling, laboratory testing and core logging. Historical estimates cover different areas and levels of exploration.
- Earlier historical estimate
- 11.5–14.9 million wet metric tonnes
- Broader historical / working estimate
- 23–26 million tonnes
- Additional exploration outlined
- ~70 drill points / ~1,400 metres
- Reported testing
- Ni, Fe, MgO and SiO₂
These estimates are not additive or directly comparable without the underlying reports. Independent drilling review and geological modelling are needed to establish a reportable resource.
Request the technical backgroundA STAGED DEVELOPMENT PATH
Build the plan.
Then establish the scale.
The project overview describes equipment-led production scenarios, with a staged increase in excavation and supporting infrastructure. These are working targets, rather than verified operating results.
- Smaller operation scenario
- ~10,000 tonnes of ore / month
- Larger operation target
- ~100,000 tonnes of ore / month
- Licence position
- Production licence reported in the overview
- Next-stage review
- Mine plan, equipment, permits and economics
Current licence validity, permitted activities, operating status and approvals need documentary confirmation. Production depends on geology, equipment, haulage, weather, approvals and buyer specifications.
Discuss the development pathwayCONNECTING THE OPERATION
Access, throughput
and a route to buyers.
A third-party jetty is reported approximately 10 kilometres from the mining area. Its suitability depends on the full transport route, handling capacity, permits and negotiated access.
- Jetty relationship
- Third-party infrastructure
- Reported distance
- Approximately 10 km
- Transport review
- Haul roads, trucks, stockpiles and loading
- Commercial review
- Specifications, offtake and delivery terms
The overview describes buyer interest at around 100,000 tonnes per month. This is not a confirmed offtake contract, secured capacity or evidence of current production.
Discuss logistics and offtake04 / ON THE GROUND
SEE THE WORK.
Inspect the detail.
Field samples, site visits and logistics imagery supplied with the opportunity. Select a photograph for a closer view.
SUPPLIED SITE FOOTAGE
A CLOSER VIEW
OF THE GROUND.
Explore the terrain, exposed geology and excavation areas in the supplied video collection.
Supplied footage; recording dates and current operating status have not been independently verified.
05 / THE COMMERCIAL PATHWAY
ACQUISITION & DEVELOPMENT.
Define the terms.
Obrien Industries connects international organisations with Indonesian project owners, licence holders and local partners. Acquisition interest, development capital and offtake requirements can each form the starting point for a project discussion.
Acquisition & investment
Establish the transaction perimeter, ownership, seller authority and available structure before progressing to detailed commercial terms.
Development & operations
Explore a partnership around technical capability, equipment, mine planning and the capital required for the next stage.
Offtake & supply
Discuss required chemistry, monthly volumes, delivery arrangements and the conditions for a long-term supply relationship.
Obrien Industries acts as a commercial introducer. Seller authority, ownership and the assets or interests available must be established with the relevant project parties.
A focused route to the right discussion.
- Define the mandateOrganisation, transaction interest, capital range and timing.
- Review the informationRelevant project material, with confidentiality arrangements where needed.
- Evaluate the assetIndependent technical and commercial review, with an approved site visit.
- Progress the termsDirect discussions with the appropriate project parties.
OTHER MINING OPPORTUNITIES
NICKEL. GOLD. COPPER.
Alongside the featured Central Sulawesi nickel project, Obrien Industries can introduce additional Indonesian mining opportunities through its local project network. Share your preferred commodity, transaction structure and development criteria to discuss relevant projects.
Discuss other mining projects06 / CONFIDENTIAL PROJECT DISCUSSIONS
DISCUSS THE
OPPORTUNITY.
Outline your acquisition or development mandate, timing and information requirements. Start with the project background, then identify the technical and commercial material needed for your review.