OIOBRIEN INDUSTRIESMINING & RESOURCESPrivate enquiries

INDONESIA / CENTRAL SULAWESI

CENTRAL
SULAWESI
NICKEL.

A 993-hectare nickel project for acquisition and development discussions. Review the historical exploration, project footprint and potential logistics through local project relationships.

MINING COMPANIES · STRATEGIC BUYERS · DEVELOPMENT PARTNERS01 / THE OPPORTUNITY
CENTRAL SULAWESI / SUPPLIED SITE FOOTAGE
PROJECT AREA993 HAAPPROXIMATELY 9.93 KM²

01 / PROJECT SNAPSHOT

NICKEL · CENTRAL SULAWESI, INDONESIA

993 HECTARES.
A closer look at the opportunity.

Assess the opportunity through four fundamentals: project area, historical geology, development requirements and access to market. The figures below are drawn from the supplied project overview and provide a starting point for independent review.

PROJECT FOOTPRINT993 ha

Mining area reported in the project overview.

HISTORICAL Ni GRADE1.6–1.8%

Common historical results; not a verified average resource grade.

HISTORICAL / WORKING ESTIMATE23–26 Mt

Nickel-bearing material. Not a certified resource or reserve.

POTENTIAL LOGISTICS OPTION~10 km

Reported distance to a third-party jetty. Access and capacity require confirmation.

Source: supplied Mining Opportunities in Indonesia overview. Project figures require independent verification. No asset valuation is implied.

02 / PROJECT LOCATION

PETASIA · NORTH MOROWALI · CENTRAL SULAWESI
SUPPLIED GEOLOGICAL MAPPROJECT OUTLINE
Highlighted project outline on the supplied geological mapApproximate trace of the boundary shown in the supplied PT Vita Indah Sejati geological map, labelled 993 hectares. Not a surveyed or independently verified boundary.Open the supplied map

Highlight traced from the supplied geological map. The source labels the project area as 993 ha. Indicative only; boundary, title and current status require verification.

A DEFINED AREA TO EVALUATE

SEE THE FOOTPRINT.
Understand the setting.

The supplied mapping places the project in Petasia, North Morowali, Central Sulawesi. Its outlined footprint provides a starting point for geological, land and access review.

Reported area
993 hectares
Supporting mapping
Geology and forest classification
Logistics opportunity
Third-party jetty reported ~10 km away

The jetty is not plotted: its coordinates and a verified haul route are not included in the supplied material.

Discuss the project footprint
Supplied photograph of a truck beside a loaded barge at a jetty

THE COMMERCIAL CONNECTION

A ROUTE
to market.

A prospective mine-to-jetty route is part of the opportunity. Confirming access, capacity and commercial terms is a critical next step.

SUPPLIED LOGISTICS PHOTOGRAPH / INFRASTRUCTURE OWNERSHIP & ACCESS TO BE VERIFIED

03 / PROJECT DOSSIER

A STRUCTURED VIEW OF THE ASSET

GEOLOGY. DEVELOPMENT. ACCESS.

Review the geological background, proposed operating scenarios and logistics assumptions. Each is a separate part of the acquisition assessment.

THE GEOLOGICAL RECORD

Work completed.
Further definition ahead.

The supplied overview records mapping, test pits, hand-auger and core drilling, sampling, laboratory testing and core logging. Historical estimates cover different areas and levels of exploration.

Earlier historical estimate
11.5–14.9 million wet metric tonnes
Broader historical / working estimate
23–26 million tonnes
Additional exploration outlined
~70 drill points / ~1,400 metres
Reported testing
Ni, Fe, MgO and SiO₂

These estimates are not additive or directly comparable without the underlying reports. Independent drilling review and geological modelling are needed to establish a reportable resource.

Request the technical background

05 / THE COMMERCIAL PATHWAY

LOCAL ACCESS. INTERNATIONAL DISCUSSIONS.

ACQUISITION & DEVELOPMENT.
Define the terms.

Obrien Industries connects international organisations with Indonesian project owners, licence holders and local partners. Acquisition interest, development capital and offtake requirements can each form the starting point for a project discussion.

01

Acquisition & investment

Establish the transaction perimeter, ownership, seller authority and available structure before progressing to detailed commercial terms.

02

Development & operations

Explore a partnership around technical capability, equipment, mine planning and the capital required for the next stage.

03

Offtake & supply

Discuss required chemistry, monthly volumes, delivery arrangements and the conditions for a long-term supply relationship.

Obrien Industries acts as a commercial introducer. Seller authority, ownership and the assets or interests available must be established with the relevant project parties.

A focused route to the right discussion.

  1. Define the mandateOrganisation, transaction interest, capital range and timing.
  2. Review the informationRelevant project material, with confidentiality arrangements where needed.
  3. Evaluate the assetIndependent technical and commercial review, with an approved site visit.
  4. Progress the termsDirect discussions with the appropriate project parties.

OTHER MINING OPPORTUNITIES

NICKEL. GOLD. COPPER.

Alongside the featured Central Sulawesi nickel project, Obrien Industries can introduce additional Indonesian mining opportunities through its local project network. Share your preferred commodity, transaction structure and development criteria to discuss relevant projects.

Discuss other mining projects

06 / CONFIDENTIAL PROJECT DISCUSSIONS

DISCUSS THE
OPPORTUNITY.

Outline your acquisition or development mandate, timing and information requirements. Start with the project background, then identify the technical and commercial material needed for your review.

CENTRAL SULAWESI, INDONESIANICKEL / PROJECT ENQUIRIES

Review and copy your message to send to your project contact. This page does not send or store your details.

YOUR PROJECT ENQUIRY

Ready to share.

Copy this message and send it to your project contact.